Repairs begin at Blackpool DWP office after metal cladding plunged from £100m building

Repair work is now taking place at Blackpool’s £100million DWP office after a large piece of metal cladding fell from the building earlier this week.

Specialist contractors have been pictured working at height on the exterior of the building, using ropes and harnesses to access the upper floors where the cladding came loose.

The incident happened at around 10.30am on Wednesday when a narrow strip of grey cladding plunged from the building, landing near the main entrance.

Repair work is now taking place at Blackpool’s £100million DWP office after a large piece of metal cladding fell from the buildingplaceholder image
Repair work is now taking place at Blackpool’s £100million DWP office after a large piece of metal cladding fell from the building | Daniel Martino

Gazette reader Cody Sampson shared an image of the affected area with the missing cladding.

Staff were evacuated as a precaution and a cordon was put in place while the area was made safe.

Lancashire Police were informed at the time, but no injuries were reported.

A DWP spokesperson said: “A contractor is on the site after some material above the entrance became loose.

“The building is currently closed until we determine next steps.”

The cladding panel was one of several vertical ‘slats’ attached to the floor-to-ceiling windows on the upper levels of the building, directly above the entrance used by staff and visitors.

Blackpool Council, which owns the building, previously said the matter was one for the Department for Work and Pensions as the occupiers.

Fylde View, which is home to around 3,000 DWP staff, opened last spring and was delivered by Blackpool Council in partnership with nationwide developer Muse and main contractor VINCI Building.

The narrow strip of grey cladding was one of the ‘slats’ covering the floor to ceiling windows on the 7th floor,  located directly above the main entranceplaceholder image
The narrow strip of grey cladding was one of the ‘slats’ covering the floor to ceiling windows on the 7th floor, located directly above the main entrance | Cody Sampson

The seven-storey office block forms part of the £350m Talbot Gateway regeneration scheme near Blackpool North railway station, aimed at bringing thousands of professional workers and students into the town centre.

The building was named best new building in Lancashire at the North West Regional Construction Awards last September.

News you can trust since 1873
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice