Lasting between one day and three weeks, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 185 roadworks beginning between Monday, February 10 and Sunday, February 16, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:

31. Wykeham Road, Lytham St Annes
What: Road closure Why: Carriageway surface dressing patching works. Works in conjunction with Norfolk Road, Talbot Road and Bellingham Road. When: Feb 13-Feb 17 | Google Maps
![What: Two-way signals
Why: [Utility repair and maintenance works] Desilting of Wet well on behalf of United Utilities to prevent pollution
When: Feb 13-Feb 13](https://www.thestar.co.uk/jpim-static/image/2025/02/07/15/53/Hall-Lane-Great-Eccleston.jpeg?crop=4:3&trim=&width=800)
32. Hall Lane, Great Eccleston
What: Two-way signals Why: [Utility repair and maintenance works] Desilting of Wet well on behalf of United Utilities to prevent pollution When: Feb 13-Feb 13 | Google Maps
![What: Multi-way signals
Why: [Utility repair and maintenance works] 3 WAY SIGNALS required for the safety of engineers to carry out pole testing. No excavation is required. TM to provide safe working area throughout.
When: Feb 13-Feb 13](https://www.thestar.co.uk/jpim-static/image/2025/02/07/15/26/Park-Lane-Forton.jpeg?crop=4:3&trim=&width=800)
33. Park Lane, Forton
What: Multi-way signals Why: [Utility repair and maintenance works] 3 WAY SIGNALS required for the safety of engineers to carry out pole testing. No excavation is required. TM to provide safe working area throughout. When: Feb 13-Feb 13 | Google Maps
![What: Two-way signals
Why: [Statutory infrastructure works] Lane closure and 2 way lights to allow for the removal of the bridge sections as part of the Catterall Footbridge Replacement works.
When: Feb 13-Feb 14](https://www.thestar.co.uk/jpim-static/image/2025/02/07/15/01/Garstang-Road-St-Michaels-(2).jpeg?crop=4:3&trim=&width=800)
34. Garstang Road, St Michaels (2)
What: Two-way signals Why: [Statutory infrastructure works] Lane closure and 2 way lights to allow for the removal of the bridge sections as part of the Catterall Footbridge Replacement works. When: Feb 13-Feb 14 | Google Maps
![What: Two-way signals
Why: [New service connection] Excavate joint bay with track in the verge and carriageway to install and joint cable for new connection
When: Feb 14-Feb 20](https://www.thestar.co.uk/jpim-static/image/2025/02/07/15/00/Bull-Park-Lane-Hambleton.jpeg?crop=4:3&trim=&width=800)
35. Bull Park Lane, Hambleton
What: Two-way signals Why: [New service connection] Excavate joint bay with track in the verge and carriageway to install and joint cable for new connection When: Feb 14-Feb 20 | Google Maps

36. Lytham Road, Bryning with Warton
What: Multi-way signals Why: Private works under S50 licence, to be carried out by GL Telecoms to cable installation for connection to solar power farm - footway & carriageway under multiway signals - manual control 0700-1900hrs. When: Feb 15-Feb 23 | Google Maps


