Lasting between one day and three weeks, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 185 roadworks beginning between Monday, February 10 and Sunday, February 16, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:

25. Burned House Lane, Preeesall
What: Two-way signals Why: Maintenance works to installed average speed camera system on A588. TM: two way signals When: Feb 12-Feb 14 | Google Maps

26. Lancaster Road, Pilling
What: Two-way signals Why: Maintenance works to installed average speed camera system on A588. TM: two way signals When: Feb 12-Feb 12 | Google Maps
![What: Two-way signals
Why: [Utility repair and maintenance works] ASHTON ON Excavate to install 96mm duct, 4m in verge then connect to the existing BT network.
When: Feb 13-Feb 17](https://www.thestar.co.uk/jpim-static/image/2025/02/07/14/23/Lea-Lane-Preston.jpeg?crop=4:3&trim=&width=800)
27. Lea Lane, Preston
What: Two-way signals Why: [Utility repair and maintenance works] ASHTON ON Excavate to install 96mm duct, 4m in verge then connect to the existing BT network. When: Feb 13-Feb 17 | Google Maps

28. Bellingham Road, Lytham St Annes
What: Road closure Why: Carriageway surface dressing patching works. Works in conjunction with Norfolk Road, Talbot Road and Wykeham Road. When: Feb 13-Feb 17 | Google Maps

29. Norfolk Road, Lytham St Annes
What: Road closure Why: Carriageway surface dressing patching works. Works in conjunction with Talbot Rd, Wykeham Road and Bellingham Road When: Feb 13-Feb 17 | Google Maps

30. Talbot Road, Lytham St Annes
What: Road closure Why: Carriageway surface dressing patching works. Works in conjunction with Norfolk Road, Wykeham Road and Bellingham Road When: Feb 13-Feb 17 | Google Maps


