Lasting between one day and two weeks, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 42 roadworks beginning between Monday, September 1 and Sunday, September 7, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:

7. Fleetwood Road, Fylde District
What: Temporary Traffic Lights Why: Roadworks scheduled (BT) When: Sept 2-Sept 4 | Google Maps
.jpeg?crop=4:3&trim=&width=800)
8. Lodge Lane, Fylde District (2)
What: Temporary Traffic Lights Why: Roadworks scheduled (BT) When: Sept 3-Sept 5 | Google Maps

9. Watery Gate Lane, Fylde District
What: Temporary Traffic Lights Why: Roadworks scheduled (BT) When: Sept 3-Sept 5 | Google Maps
.jpeg?crop=4:3&trim=&width=781)
10. Lodge Lane, Fylde District (3)
What: Temporary Traffic Lights Why: Roadworks scheduled (Global Utility Connections) When: Sept 4-Sept 17 | Google Maps

11. Dock Road, Fylde District
What: Temporary Traffic Lights Why: Roadworks scheduled (Virgin Media) When: Sept 5-Sept 9 | Google Maps
.jpeg?crop=4:3&trim=&width=800)
12. Fleetwood Road, Fylde District (2)
What: Temporary Traffic Lights Why: Roadworks scheduled (BT) When: Sept 6-Sept 8 | Google Maps


