Lasting between one day and three days, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 51 roadworks beginning between Monday, July 14 and Sunday, July 20, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Two-way signals
Why: [New service connection] Excavate joint bay in the footway/verge with track to install and joint cable for new connection
When: July 15-July 18](https://www.thestar.co.uk/jpim-static/image/2025/07/12/16/53/Garstang-Road-Singleton.jpeg?crop=4:3&trim=&width=800)
7. Garstang Road, Singleton
What: Two-way signals Why: [New service connection] Excavate joint bay in the footway/verge with track to install and joint cable for new connection When: July 15-July 18 | Google Maps
![What: Lane closure
Why: [Highway repair and maintenance works] To replace traffic signal pole following RTA
When: July 15-July 15](https://www.thestar.co.uk/jpim-static/image/2025/07/12/16/19/Edith-Rigby-Way-Fylde.jpeg?crop=4:3&trim=&width=637)
8. Edith Rigby Way, Fylde
What: Lane closure Why: [Highway repair and maintenance works] To replace traffic signal pole following RTA When: July 15-July 15 | Google Maps
![What: Two-way signals
Why: [New service connection] NEW GAS SERVICE CONNECTION REQUIRED - EXCAVATION OF 6M WILL BE ACROSS PUBLIC CARRIAGEWAY
When: July 15-July 21](https://www.thestar.co.uk/jpim-static/image/2025/07/12/16/51/Back-Lane-Greenhalgh-with-Thistleton.jpeg?crop=4:3&trim=&width=800)
9. Back Lane, Greenhalgh with Thistleton
What: Two-way signals Why: [New service connection] NEW GAS SERVICE CONNECTION REQUIRED - EXCAVATION OF 6M WILL BE ACROSS PUBLIC CARRIAGEWAY When: July 15-July 21 | Google Maps
![What: Multi-way signals
Why: [Utility asset works] safe access required to carriageway box for engineers to provide service to a customer
When: July 15-July 16](https://www.thestar.co.uk/jpim-static/image/2025/07/12/16/26/St-Andrews-Road-North-Lytham-St-Annes.jpeg?crop=4:3&trim=&width=800)
10. St Andrew's Road North, Lytham St Annes
What: Multi-way signals Why: [Utility asset works] safe access required to carriageway box for engineers to provide service to a customer When: July 15-July 16 | Google Maps
![What: Multi-way signals
Why: [Highway improvement works] Remove and build of bus shelter
When: July 16-July 17](https://www.thestar.co.uk/jpim-static/image/2025/07/12/16/06/Poulton-Street-Kirkham.jpeg?crop=4:3&trim=&width=800)
11. Poulton Street, Kirkham
What: Multi-way signals Why: [Highway improvement works] Remove and build of bus shelter When: July 16-July 17 | Google Maps
![What: Two-way signals
Why: [Utility repair and maintenance works] GANG TO REPLACE MANHOLE FRAME AND COVER IN CARRIAGEWAY WITH PERMANENT REINSTATEMENT
When: July 16-July 16](https://www.thestar.co.uk/jpim-static/image/2025/07/12/16/26/Bryning-Lane-Ribby-with-Wrea.jpeg?crop=4:3&trim=&width=800)
12. Bryning Lane, Ribby with Wrea
What: Two-way signals Why: [Utility repair and maintenance works] GANG TO REPLACE MANHOLE FRAME AND COVER IN CARRIAGEWAY WITH PERMANENT REINSTATEMENT When: July 16-July 16 | Google Maps


