Lasting between one day and a month, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 52 roadworks beginning between Monday, March 31 and Sunday, April 6, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Multi-way signals
Why: [Highway improvement works] REMOVE & INSTALL SHELTER
When: Apr 2 - Apr 3](https://www.thestar.co.uk/jpim-static/image/2025/03/30/14/30/Clifton-Drive-North-Lytham-Saint-Annes.jpeg?crop=4:3&trim=&width=800)
7. Clifton Drive North, Lytham Saint Annes
What: Multi-way signals Why: [Highway improvement works] REMOVE & INSTALL SHELTER When: Apr 2 - Apr 3 | Google Maps
![What: Road closure
Why: [New service connection] Excavate joint bay with approximately 380m of track to install and LAY NEW 520m cable for Weeton Barracks
When: Apr 2 - Apr 14](https://www.thestar.co.uk/jpim-static/image/2025/03/30/15/51/Singleton-Road-Weeton.jpeg?crop=4:3&trim=&width=800)
8. Singleton Road, Weeton
What: Road closure Why: [New service connection] Excavate joint bay with approximately 380m of track to install and LAY NEW 520m cable for Weeton Barracks When: Apr 2 - Apr 14 | Google Maps
![What: Multi-way signals
Why: [Utility repair and maintenance works] GANG TO REPLACE MANHOLE FRAME AND COVER IN CARRIAGEWAY WITH PERMANENT REINSTATEMENT
When: Apr 3 - Apr 3](https://www.thestar.co.uk/jpim-static/image/2025/03/30/15/04/Heyhouses-Lane-Lytham-St-Annes.jpeg?crop=4:3&trim=&width=800)
9. Heyhouses Lane, Lytham St Annes
What: Multi-way signals Why: [Utility repair and maintenance works] GANG TO REPLACE MANHOLE FRAME AND COVER IN CARRIAGEWAY WITH PERMANENT REINSTATEMENT When: Apr 3 - Apr 3 | Google Maps
![What: Multi-way signals
Why: [Utility asset works] Replace 530m gas main with 67 associated services and connections
When: Apr 5 - May 2](https://www.thestar.co.uk/jpim-static/image/2025/03/30/15/31/Garstang-Road-North-Wesham.jpeg?crop=4:3&trim=&width=800)
10. Garstang Road North, Wesham
What: Multi-way signals Why: [Utility asset works] Replace 530m gas main with 67 associated services and connections When: Apr 5 - May 2 | Google Maps
![What: Multi-way signals
Why: [Utility repair and maintenance works] Open cut excavation required to repair/ rebuild frame and cover chamber
When: Apr 6 - Apr 6](https://www.thestar.co.uk/jpim-static/image/2025/03/30/15/50/St-Georges-Park-Kirkham.jpeg?crop=4:3&trim=&width=800)
11. St Georges Park, Kirkham
What: Multi-way signals Why: [Utility repair and maintenance works] Open cut excavation required to repair/ rebuild frame and cover chamber When: Apr 6 - Apr 6 | Google Maps


