Lasting between one day and six months, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As 87 roadworks are beginning between Monday, April 1 and Sunday, April 7, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at all the major roadworks you will want to be aware of this week, including how long the work is scheduled to last and why:
![What: Two-way signals
Why: [Disconnection or alteration of supply] Long sided disconnection of old lead supply and replace with new connection (2ND HALF)
When: Apr 3-Apr 5](https://www.thestar.co.uk/jpim-static/image/2024/03/29/12/21/k.jpg?crop=4:3&trim=&width=800)
13. Kirkham Road, Treales Roseacre and Wharles
What: Two-way signals Why: [Disconnection or alteration of supply] Long sided disconnection of old lead supply and replace with new connection (2ND HALF) When: Apr 3-Apr 5 | Google Maps
![What: Multi-way signals
Why: [Utility repair and maintenance works] Excavate large Joint bay in footway to remove existing link box and replace with a
When: Apr 3-Apr 10](https://www.thestar.co.uk/jpim-static/image/2024/03/29/13/20/br.jpg?crop=4:3&trim=&width=800)
14. Breck Road, Poulton-le-Fylde
What: Multi-way signals Why: [Utility repair and maintenance works] Excavate large Joint bay in footway to remove existing link box and replace with a When: Apr 3-Apr 10 | Google Maps
![What: Two-way signals
Why: [Utility asset works] ST. MICHAELS 1121014 - To build new FOOTWAY joint box and lay approx 1m of Duct 54/56 in
When: Apr 3-Apr 5](https://www.thestar.co.uk/jpim-static/image/2024/03/29/13/36/gar.jpg?crop=4:3&trim=&width=800)
15. Garstang Road, St Michaels
What: Two-way signals Why: [Utility asset works] ST. MICHAELS 1121014 - To build new FOOTWAY joint box and lay approx 1m of Duct 54/56 in When: Apr 3-Apr 5 | Google Maps

16. Ribby Road, Ribby with Wrea
What: Multi-way signals Why: Private works under Roadspace licence to be carried out by Manchester Surfacing for tactile replacement & refresh linings at bus stops - footway & carriageway under multiway signals (0930-1500hrs). When: Apr 4-Apr 5 | Google Maps
![What: Multi-way signals
Why: [Remedial works] Repair of defective reinstatement
When: Apr 4-Apr 8](https://www.thestar.co.uk/jpim-static/image/2024/03/29/14/53/hig.jpg?crop=4:3&trim=&width=800)
17. High Cross Road, Poulton-le-Fylde
What: Multi-way signals Why: [Remedial works] Repair of defective reinstatement When: Apr 4-Apr 8 | Google Maps
![What: Two-way signals
Why: [Disconnection or alteration of supply] Short sided disconnection of old lead supply and replace with new connection (REJOIN)
When: Apr 4-Apr 5](https://www.thestar.co.uk/jpim-static/image/2024/03/29/14/58/hil.jpg?crop=4:3&trim=&width=800)
18. Hillylaid Road, Thornton Cleveleys
What: Two-way signals Why: [Disconnection or alteration of supply] Short sided disconnection of old lead supply and replace with new connection (REJOIN) When: Apr 4-Apr 5 | Google Maps
