Lasting between one day and two weeks, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 79 roadworks beginning between Monday, April 28 and Sunday, May 4, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:

19. Bilsborrow Lane, Bilsborrow
What: Two-way signals Why: Private works under Section 50 licence, carried out by NORTH WEST MULTI UTILITIES PRESTON_LTD to INSTALLATION OF ELECTRIC SERVICES TO 4 NEW BUILDS When: Apr 30-May 10 | Google Maps
![What: Two-way signals
Why: [New service connection] To Install x4 Short sided 25 mm PE Connection to the 90mm PE 1998 main
When: Apr 30-May 2](https://www.thestar.co.uk/jpim-static/image/2025/04/26/16/56/Cart-Gate-Preesall.jpeg?crop=4:3&trim=&width=800)
20. Cart Gate, Preesall
What: Two-way signals Why: [New service connection] To Install x4 Short sided 25 mm PE Connection to the 90mm PE 1998 main When: Apr 30-May 2 | Google Maps
.jpeg?crop=4:3&trim=&width=800)
21. Preston New Road, Newton with Clifton (4)
What: Lane closure Why: BSIP Works - Installing new bus stop quality kerbs and resurfacing footway - Lane Closure with IPV When: May 2-May 2 | Google Maps


