Lasting between one day and a month, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 152 roadworks beginning between Monday, February 17 and Sunday, February 22, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:

7. Fleetwood Road, Fleetwood
What: Two-way signals Why: Private works under Roadspace licence, for hedge cutting to be carried out on behalf of Wyre Borough Council - footway & carriageway under two-way signals (works will only take 1 day). When: Feb 17-Feb 21 | Google Maps
![What: Two-way signals
Why: [Utility repair and maintenance works] Maintenance of SLM equipment in CSO chamber on behalf of United Utilities
When: Feb 17-Feb 17](https://www.thestar.co.uk/jpim-static/image/2025/02/14/15/13/Hall-Gate-Lane-Preesall.jpeg?crop=4:3&trim=&width=800)
8. Hall Gate Lane, Preesall
What: Two-way signals Why: [Utility repair and maintenance works] Maintenance of SLM equipment in CSO chamber on behalf of United Utilities When: Feb 17-Feb 17 | Google Maps
![What: Road closure
Why: [Utility asset works] PILLING 1157324 & 1157358 - POLING WORKS - Replace 2 x BT poles in verge.
When: Feb 17-Feb 18](https://www.thestar.co.uk/jpim-static/image/2025/02/14/15/45/Fluke-Hall-Lane-Pilling.jpeg?crop=4:3&trim=&width=800)
9. Fluke Hall Lane, Pilling
What: Road closure Why: [Utility asset works] PILLING 1157324 & 1157358 - POLING WORKS - Replace 2 x BT poles in verge. When: Feb 17-Feb 18 | Google Maps
![What: Two-way signals
Why: [Disconnection or alteration of supply] Excavate joint bay in the verge to carry out service disconnection.
When: Feb 18-Feb 21](https://www.thestar.co.uk/jpim-static/image/2025/02/14/15/08/Broadway-Fleetwood.jpeg?crop=4:3&trim=&width=800)
10. Broadway, Fleetwood
What: Two-way signals Why: [Disconnection or alteration of supply] Excavate joint bay in the verge to carry out service disconnection. When: Feb 18-Feb 21 | Google Maps

11. Preston New Road, Freckleton
What: Lane closure Why: Private works under Road Space Licence, carried out by chevron traffic management to Lorry parked on the carriageway to deliver some equipment into the field adjacent to the road When: Feb 19-Feb 19 | Google Maps
![What: Lane closure
Why: [Diversionary works] Excavate joint bays with 80 metres of track in the footway and carriageway to install and joint cable for new services
When: Feb 19-Feb 28](https://www.thestar.co.uk/jpim-static/image/2025/02/14/15/28/Amy-Johnson-Way-Lytham-St-Annes.jpeg?crop=4:3&trim=&width=769)
12. Amy Johnson Way, Lytham St Annes
What: Lane closure Why: [Diversionary works] Excavate joint bays with 80 metres of track in the footway and carriageway to install and joint cable for new services When: Feb 19-Feb 28 | Google Maps


