BAE Systems seek new building to bring home workers back into the office at their Samlesbury base

Bosses at BAE Systems want permission for a major new building at their Samlesbury site - and it’s partly to bring homeworkers back into the office.

An application has been made to Ribble Valley Borough Council (RVBC)for the erection of a new three-storey modular building with a floor area of approximately 7,000sm.

According to planning statements, it would house 560 BAE staff made up of:

• Staff that were temporarily displaced from an original modular office building, previously located on the proposed site, that was demolished in 2024, who were temporarily located in other office buildings on the Samlesbury site

• Staff currently located in various office buildings across the BAE Samlesbury site;

• A small number of staff that are currently home working, who pre-Covid, were permanently based at the BAE Samlesbury site.

No additional employees are proposed as part of the development and demand is not expected to increase.

An idea of how the new modular building at BAE Samlesbury could lookplaceholder image
An idea of how the new modular building at BAE Samlesbury could look | Portakabin/BAE Systems/RVBC

Parking

Based on the advice from RVBC, the scheme should provide between 133-175 parking spaces. BAE have confirmed that they will provide the higher number of 175 spaces. This is to be achieved by providing: 22 spaces on a proposed re lined car park to the west of the site in close proximity to the proposed office building, and 153 spare spaces allocated at parking areas in Zone 6 and Zone 14.

It is also proposed to provide a covered shelter for 18 cycles as part of the development, as well as changing and shower facilities in the building.

Access

The proposed development is to be accessed via the existing BAE Systems internal road network. The car park is located to the west of the Main Entrance.

A statement to RVBC says: “There will be a small number of staff who will return to the BAE Site having worked from home following the Covid pandemic. Vehicles generated by these returning staff members are not strictly new traffic movements as they were based at the Site prior to 2020 and their travel patterns have been accommodated by the local highway network in the recent past. Notwithstanding this, the BAE Samlesbury Site benefits from three purpose-built, high-capacity traffic signal junctions that connect with the local highway network. This helps to distribute BAE traffic across the A59 and A677 routes. The Sir Frederick Page Way route between the A59 and A677 is relatively new and opened in 2018. This has helped to better distribute BAE traffic with the introduction of a dedicated access route on A677 Preston New Road. This is particularly useful for staff members with and origin/destination to the east/Blackburn.

“Taking all of the above into account, it is considered that the proposed development is highly unlikely to have a material impact on the functioning of the local highway network.”

A decision will be made in coming weeks by RVBC.

For the latest public notices from your area, please visit: https://publicnoticeportal.uk/

News you can trust since 1873
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice