All the Blackpool roadworks starting this week including road closures and lane restrictions
All the major roadworks set to start and continue across Blackpool between June 1 and June 13.
The works mainly consist of temporary traffic signals, lane closures and carriageway restrictions linked to ongoing upgrades and routine highway maintenance by local authorities and contractors.
Motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why.
Holly Road, Blackpool
Blackpool Council will be carrying out resurfacing patching to sections of Devonshire Road and its side roads in phases.
NB: Devonshire Road will remain and subject to traffic control lights.


REASON: Because of the likelihood of danger to the public during works being undertaken to allow for resurfacing patching works.
DURATION A period of 3 days from 08 June 2026 between the hours of 9 am – 4 pm
Troutbeck Crescent, Blackpool
Prohibit any vehicle from entering or proceeding in any direction along a section of Troutbeck Crescent from its junction with Hawkshead Terrace to its junction with the side of 39 Troutbeck Crescent.
REASON: Because of the likelihood of danger to the public during works being undertaken to allow for remedial works.
DURATION A period of 3 days from 08 June 2026.


Epsom Road, Blackpool
Prohibit any vehicle from entering or proceeding in any direction along Epsom Road from its junction with Sevenoaks Drive to its junction with Eastpines Drive.
No left or right turn onto Epsom Drive from its junction with Back Epsom Road.
REASON: Because of the likelihood of danger to the public during works being undertaken to allow for carriageway resurfacing.
DURATION A period of 4 days from 02 June 2026.


Warren Drive, Blackpool
Prohibit any vehicle from entering or proceeding in any direction along a section of Warren Drive from its junction with Seabrook Drive to its junction with Sevenoaks Drive.
REASON: Because of the likelihood of danger to the public during works being undertaken to allow for carriageway resurfacing.
DURATION A period of 5 days from 01 June 2026.