DCSIMG

Why register?

CloseX

If you have not signed up previously

It's free and only takes a minute!
Benefits to registering with us
comment on storiesComment on stories
Customise daily e-mail newslettersCustomise daily e-mail newsletters
Arrange your newspaper/digital subscriptions onlineArrange your newspaper/digital subscriptions online
Offers, promotions and deals from partnersOffers, promotions and deals from partners
Add/claim your business on Find itAdd/claim your business on Find it
  • 19/06/13
  • 10°C to 18°C Sunny spells
  • Blackpool 5-day weather forecast

    CloseX

    Thursday 20 Jun

    Light rain

    Temp

    High18°c

    Low13°c

    Wind

    From South east

    Speed12 mph

    Friday 21 Jun

    Cloudy

    Temp

    High17°c

    Low13°c

    Wind

    From West

    Speed16 mph

    Saturday 22 Jun

    Light showers

    Temp

    High16°c

    Low12°c

    Wind

    From South west

    Speed25 mph

    Sunday 23 Jun

    Light showers

    Temp

    High16°c

    Low12°c

    Wind

    From West

    Speed31 mph

    Monday 24 Jun

    Sunny spells

    Temp

    High16°c

    Low11°c

    Wind

    From West

    Speed23 mph

  • Like us
  • Follow us
  • Place your Ad
  • Subscribe

Prom road scheme hit by controversy

Potholes appearing along Blackpool promenade.

Potholes appearing along Blackpool promenade.

  • by Shelagh Parkinson
 

THE new Promenade has been dogged with controversy.

During the work to reduce the carriageway in front of The Tower from four lanes to two, there was anger from drivers facing long delays.

Since the scheme opened in June 2011, a 20mph speed limit has been in force but during the busiest times of the year, traffic flow has been even slower, prompting calls for a return to four lanes.

There has also been criticism of the shared space concept introduced as part of the project.

It means pedestrians and vehicles have equal rights and traffic is meant to stop to allow people to cross.

But disabled groups including the Blind Society have hit out at the scheme, and said it was difficult for visually impaired people to differentiate between the road and the pavement due to the lack of kerbs.

An audit of the new layout, by transport planning consultants Phil Jones Associates, recommended changes were made including the addition of a new crossing in front of The Tower, that bollards and street furniture be introduced to define the shared pavement and road areas, and 20mph signs put in place.

Work on the zebra crossing is due to start later this month, and will mean there are four on the stretch between New Bonny Street and Talbot Square.

The consultants identified that “very few drivers gave priority to pedestrians starting to cross.”

Cracks first started to appear in the carriageway 12 months ago, just months after the work had been completed.

On that occasion the problems were described as small scale, and repairs were carried out overnight in order to minimise disruption.

But queues have formed once again in recent times due to further work having to be carried out after the appearance of the latest damage.

Read how The Gazette reported the story:

PROMENADE IS BREAKING UP

Click here to register with The Gazette website to enable you to leave your comments and reaction to stories.

 

Comments

 
 

Back to the top of the page